Abstract

In view of the imbalance and even the abnormal phenomenon of reactive circulation of parallel high voltage transmission lines with similar measured parameters in actual operation, combined with field investigation and test, theoretical analysis and simulation demonstration, it is clear that this phenomenon is caused by the use of unconventional phase sequence and unreasonable transposition of the two-circuit lines when erecting the same tower. Based on the PSCAD simulation, the corresponding improvement measures are put forward from two aspects of optimizing the arrangement of phases and transposition. The results show that in order to solve the power imbalance problem of parallel coupled transmission lines, it is recommended to optimize the phase sequence of conductors in consideration of economy and operability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.