Abstract

In the process of geothermal tailwater reinjection of sandstone, the problem of plugging has been seriously restricting the continuous development of geothermal reinjection for many years, and the problems of plugging are complex and changeable. The plugging in the process of reinjection can be divided into physical plugging, chemical plugging, microbial plugging and gas plugging. Given these four types of blocking, according to the mechanism characteristics of the blocking caused by them, this paper puts forward corresponding blocking prevention measures and solves the current blocking problems by filtering, adding a scale inhibitor, intermittent reinjection, adding chlorine dioxide and regular lifting. In addition, the existing reinjection process and the equipment flow are relatively simple and cannot achieve the goal of efficient reinjection. Therefore, a complete set of reinjection processes is designed to ensure the efficient reinjection of sandstone geothermal tailwater.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.