Abstract

The trend of a river erosion and deposition is the first construction condition for a bridge construction. In order to evaluate the construction conditions of a bridge located at the end of Ganjiang River, based on the two-dimensional flow and sediment mathematical model, the amount and distribution of sediment erosion and deposition in the river reach under various typical and series of annual flow and sediment processes were calculated and analysed in this paper. The results show that the river reach where the project is located is dominated by micro siltation under various water and sediment processes, but the unfavourable conditions caused by local scour of piers should be considered in the construction of the project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call