Abstract

When a significant portion of renewable energy is transmitted to the power grid through high voltage direct current, when the monopolar blocking occurs, as a result of the converter station’s filter and reactive power compensation equipment’s influence, overvoltage will be generated, which will cause harm to the new energy station, and even lead to large-scale new energy grid disconnection. This paper initially examines the mechanism behind overvoltage in a new energy power grid and then puts forward a method to restrain overvoltage by using phase modulation operation of hydroelectric generating units. To improve the phase modulation capability of hydroelectric generating units and optimize the utilization of new energy sources, this paper proposes a particle swarm optimization to determine the optimal phase modulation capacity. Finally, this paper builds an example of the PSASP platform to verify the correctness and effectiveness of collaborative optimization.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.