Abstract

Based on the paste-like roadway backfill technology in the study of coal mining under the freeway in Tang’an Mine, the mining scheme of coal under the freeway is described. In order to grasp the change law of the stress and damage degree of coal pillars and surrounding rocks during the coal mining process of roadway backfill, analyze the stability of coal pillars and the amount of roof subsidence, using FLAC3D numerical simulation method, select the width of coal pillar elastic plastic zone, the vertical stress of the column and the vertical displacement of the roof are used as indicators. The influence of the 15m temporary coal pillar width on the stability of the coal pillar, the stress distribution of the surrounding rock and the sinking of the roof under the mining method are studied to verify the feasibility of the mining scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.