Abstract

In the Industry 4.0 environment, an ideal smart factory should be intelligent, green, and humanized, and the logistics transportation from raw materials to final products in the factory should be completed by smart logistics. In order to address the problems of low efficiency, poor workstation service satisfaction, high distribution costs, and non-greening during the logistics distribution processes in discrete smart manufacturing workshops are required. A mathematical model of optimized multi-objective green logistics distribution paths in a smart manufacturing workshop has been constructed in this study, with low costs, high efficiency, and workstation service satisfaction taken into consideration. Then, this mathematical model was solved with an improved ant colony optimization algorithm. A “time window span” was introduced in the basic ant colony optimization algorithm to prioritize the services to workstations with a relatively high urgency in material demand, with the aim of improving workstation service satisfaction. Lastly, in order to verify the effectiveness of the model and algorithm proposed in this study, a simulation experiment has been conducted on the workstation logistics distribution system in a smart manufacturing workshop to provide convincing evidence for optimizing workstation logistics distribution paths in workshops of discrete manufacturing enterprises.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call