Abstract
Considering the micro-arching effect between pipe umbrella, the paper investigates the mechanical response of pipe umbrellas during tunnel excavation by simulating pipe umbrellas as Timoshenko beams on a Pasternak foundation. The finite difference method is employed to solve the deflection, bending moment, and shear force of pipe umbrellas. By analyzing and contrasting with real-world engineering monitoring data, finite element computation results, and existing theories of other researchers, the reliability of the proposed method is verified, and good agreements are observed. A new parameter δp is introduced in our method to represent the proportion of overlying load transmitted through the pipe umbrella, and influences of stiffness of the surrounding rock in front of the tunnel face, initial support stiffness, pipe umbrella design schemes, and excavation depth on the load transfer capacity of the pipe umbrella are subsequently investigated. The conclusions reveal that increases of surrounding rock stiffness, initial support stiffness, and diameter of pipe umbrellas would all enhance the stability of both the tunnel and pipe umbrellas. However, such enhancements have certain limitations. Particularly, when the excavation footage c <1 m, the pipe umbrella diameter should be specifically selected based on cases.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.