Abstract

To evaluate the safety of a steel box bridge during the construction of a metro station, the process of excavation which was based on the metro station and its overpass bridge in Chengdu was analyzed. A detailed FE model was established which include the soil, the station and the bridge using general finite element software ALGOR. According to the procedure of the constructing station and completed station, investigating the absolute settlements and differential settlements of the earths surface and foundation in metro station incidence, the effect on the steel box girder overall stress and local stress was analyzed extensively. The results demonstrated that the excavation has a insignificant influence on the deformations and stresses of the steel girder. Thus it provides an important understanding of the interactions of bridge structures and underground constructions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.