Abstract

DEVELOPMENT CONTROL PLAN FOR THE SUB-CENTER OF BEIJING (2016-2035) says, a facility service ring with complex functions, balanced layout and integrated above ground and underground space will be constructed, which is efficient integrated underground infrastructure, with a total length of about 36.5 kilometers, coordinating the construction of circular underground systems such as subway, utility tunnel, urban underground logistics, and automatic garbage collection and transfer, and jointly building municipal facilities such as hidden municipal facilities, multi-level rainwater control and utilization facilities, emergency evacuation facilities, underground peak-storage and peak-regulation facilities. Aiming at the feasibility of the project, though analyzing in detail the present situation and planning of land use, pipeline and underground space along the ring and surrounding areas, and fully sorting out the functions and space demand characteristics of the major systems in the facility service ring, deeply explore the advanced technologies such as urban underground logistics and automatic garbage collection and transfer, and propose the inclusive and multifunctional underground space implementation strategies, for the meticulous use of underground space.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call