Abstract

DEVELOPMENT CONTROL PLAN FOR THE SUB-CENTER OF BEIJING (2016-2035) says, a facility service ring with complex functions, balanced layout and integrated above ground and underground space will be constructed, which is efficient integrated underground infrastructure, with a total length of about 36.5 kilometers, coordinating the construction of circular underground systems such as subway, utility tunnel, urban underground logistics, and automatic garbage collection and transfer, and jointly building municipal facilities such as hidden municipal facilities, multi-level rainwater control and utilization facilities, emergency evacuation facilities, underground peak-storage and peak-regulation facilities. Aiming at the feasibility of the project, though analyzing in detail the present situation and planning of land use, pipeline and underground space along the ring and surrounding areas, and fully sorting out the functions and space demand characteristics of the major systems in the facility service ring, deeply explore the advanced technologies such as urban underground logistics and automatic garbage collection and transfer, and propose the inclusive and multifunctional underground space implementation strategies, for the meticulous use of underground space.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.