Abstract

The implementation of a building construction project is unavoidable from the emergence of waste material. Construction material waste is defined as something that is over what is required. This study intends to find the application of construction waste management in building construction projects to minimize the waste material. Data was collected using observation, interviews, and distributing questionnaires to 4 building project parties in Central Java using a random sampling method. Data analysis was carried out by descriptive analysis to determine the type and cause of the highest waste material and supported by regression and correlation analysis to assess the application of ways to minimize waste material. The results of data analysis show that the most types of waste material are formwork wood, reinforcing steel, concrete, and cement. The factor causing waste material that most often occurs is the design change factor that comes from the design phase. Based on the analysis, the effort to minimize waste material that is the most influential on it is improving the quality of tool and material management by providing training to construction personnel related to materials construction used

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.