Abstract

Coal mine has stepped into deep mining period in China, in which the ground pressure is great, the stability of the surrounding rock is poor and roadway is seriously destroyed. 3302 trick roadway of Zhaolou coal mine is the kilometers depth roadway, under the condition of original supporting, the roof settling amount and the surrounding rock deformation were large, which made bad effect on safety production. The surrounding rock failure region was monitored by borehole televiewer and ground penetrating radar, and the loosening failure law was analyzed. The scheme of high prestressed anchor beam was proposed according to the detection results, the crack distribution of surrounding rock and the stress of blots and anchors of original scheme and optimized scheme were analyzed by UDEC. The results of numerical simulation and field monitoring showed that increasing prestress of blot and anchors was better for the control of roof separation in anchorage zone and maintaining the integrity of roof, and high prestressed anchor beam can effectively improve the effect of surrounding rock control in roadways.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call