Abstract
This study focuses on investigating the surface settlement characteristics induced by the construction of a super-large-diameter shield tunnel in composite strata. By utilizing a combination of field monitoring and numerical simulation analysis, the surface settlement patterns encountered during the construction process in horizontally distributed typical soil–rock composite strata were summarized based on the 16.03 m super-large-diameter shield tunnel project in the southerly extension of He’ping Avenue in Wuhan. In addition, the collected data were used to enhance the Peck empirical formula. The results of the study show the following: (1) Significant non-uniform settlement occurs along the tunneling direction when the shield machine passes through soil–rock composite strata. The range of non-uniform settlement is approximately 3.1 times the tunnel diameter (D) in soil sections and 1.9 times the tunnel diameter (D) in rock sections. (2) The impact of composite strata on the maximum settlement is greater than its effect on the settlement trough width, with a larger impact within the soil sections compared to the rock sections. (3) The Peck correction formula, which takes into account the distance between the monitoring cross-section and the composite interface, provides more accurate predictions than the original Peck empirical formula.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.