Abstract

This paper deals with flood mitigation measures by only one side dike on almost primitive rivers. If those rivers are left at existing conditions, the lands might be improved at random with irrigation channels and drainage channels constructed without any relation to flood mitigation, at which conditions it will take a lot of cost and time to execute effective flood mitigation works. Here, it is proposed to be beneficial to make a flood mitigation plan by one side dike at early stage development of land through two examples on the Apure River and the Chama River in Venezuela.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.