Abstract
There is large amount of high hardness sand in the water flow in Dadu river. The problem of sediment deposition is very prominent in the two early reservoirs, Gongzui reservoir and Tongjiezi reservoir. In order to decrease sediment deposition effectively and extend the service life of them, the sediment characteristics of Dadu river cascade hydropower stations are analysed, as well as changes of sediment deposition in Gongzui reservoir and Tongjiezi reservoir after Pubugou reservoir puts into operation. Flood forecast and pre-discharge operation theory are studied for utilizing the discarding water to improve sediment-flushing effect, and flood and sediment joint dispatching schemes of cascade reservoirs are proposed. In order to evaluate effects of joint dispatching schemes, SBED extended one-dimensional flushing sediment mathematical model of deposited reservoir is built, and the mathematical model is used for simulative computation of coming 20-years sediment-flushing effect. After that, the effects of different schemes are analyzed comparatively. Three conclusions can be drawn from the studying. Firstly, the sediment in Gongzui reservoir and Tongjiezi reservoir is obviously reduced after Pubugou reservoir puts into operation. Secondly, flood forecast, pre-discharge operation theory and creating sand-flushing conditions can obviously improve sediment-flushing effects and avoid wasting power generation water when the water levels and outflows of Pubugou reservoir, Gongzui reservoir and Tongjiezi reservoir are rationally controlled. Finally, the larger the inflows and the lower the water level of Gongzui reservoir and Tongjiezi reservoir is, the more obvious the sediment-flushing effects are. According to situations of power plant at the time, such as rules of flood controlling and operation requirements of flood discharge facilities, it is recommended that the inflow of Gongzui reservoir is controlled at about 4500m3/s, and timely lower the water levels of Gongzui reservoir and Tongjiezi reservoir to their dead water levels, when carrying out joint dispatching schemes.
Highlights
Dadu River is located in the midwest regions of Sichuan Province in China, and originated in Qinghai Province
Soil erosion is serious in the middle reaches with modulus 16704t/
Before Pubugou reservoir puts into operation, the problem of sediment deposition of Gongzui reservoir and Tongjiezi reservoir is becoming more and more serious for the large amount of sand
Summary
Dadu River is located in the midwest regions of Sichuan Province in China, and originated in Qinghai Province. Water losses and soil erosion is not serious in the upper reaches of Dadu river, annual average modulus of sediment runoff is 164t / (km2 a). After Pubugou reservoir impoundment, bed load and be 86.5%, and annual average sediment concentration of most of the suspended sediment above over the dam are outflow water 112g/m3. After 100 years’ operation composed of the sediment discharged from the Pubugou the total deposit volume of Pubugou reservoir will be1.86 reservoir and the sand from Pubugou-Gongzui section. The remaining adjustment capacity will be total deposition volume of Pubugou reservoir will be 1.11 2.88 billion m3. 100 years later, considering the blocking sediment ratio of Pubugou reservoir to be 85%, the annual average sediment-transportation of suspended sediment in outflow will be 4.76 million tons at the dam site of Pubguou hydropower station. Taking sediment from Pubugou-Gongzui section into consideration, 5.80 million tons, the annual average sediment-transportation of suspended sediment is 10.60 million tons at the dam site of Gongzui hydropower station[3]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.