Abstract
This study focuses on monitoring the deformation of the shallow unsymmetrical section of a super-large-span tunnel portal relying on the newly built Shimentangshan Tunnel, and through numerical simulations, the construction sequence and drift ratios were optimized to address challenges related to the stability of surrounding rock and structure. The findings indicate that employing the double-side drift method results in a maximum settlement value of 107.0 mm and a maximum convergence value of 108.8 mm, leading to larger deformations. Excavating the shallow buried side first followed by the deep buried side proves beneficial for deformation control of the support structure and effectively limits damage to the surrounding rock. A drift ratio of 0.3 ensures optimal support structure security and stability. Considering both structural deformation and surrounding rock damage, a ratio between 0.25 and 0.35 for the drifts is recommended. Taking into account construction efficiency and economic benefits, a construction plan for the shallow buried unsymmetrical section at the portal of super-large-span tunnels is proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.