Abstract

Aimed at the production technological process, analysis has been carried out on the current situation of workshop layout, and find out the existed problems; Systematic Layout Planning (SLP) method is exerted to analyze the workshop concerning relationship between logistics and non-logistics, draw out correlation diagram of location of working unit and correlation diagram of area of working unit. Two optimum proposals are determined according to the realistic of workshop, and weighting factor method is adopted for evaluation, thus obtain the optimal layout proposal. So that aims are achieved for workshop like shorter logistics route, effectively usage of space and resource, improvement of working environment and improvement of production efficiency of enterprises.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.