Abstract

In this project, some engineering materials will be used, such as reinforcing bar, commercial concrete. Because the site underground water level is higher, in order to prevent the surrounding buildings and roads happens the non-uniform settlement, the settlement must be observed, using single double station observation way, each settlement will draw up the curve, and according to the settlement curve for foundation pit precipitation to the influence of the architecture around the research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.