Abstract
On the basis of surrounding environment, including ground geological and hydrogeological condition of a connection line between line 1 and line 3 in Chengdu subway, open cut method is used to build the connection line. The whole line is divided into three sections, shotcrete and bolt support is adopted to maintain the stability of foundation pit by slope excavation, well rotary bored piles are used to support other foundation pit of the connection line. Meanwhile, the designed parameters of dewatering well points for the open cut tunnel are discussed and the anti-buoyancy ability of open cut tunnel is also analyzed in the paper. The purpose of this paper is to lead the design of open cut tunnels in Chengdu cities, including such similar subway tunnels in other cities in the world.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.