Abstract
In the excavation for underground powerhouse, the blasting vibration leads to dynamic disturbance for construction safety and stability, which means such vibration should be monitored and mitigated. In this paper, the Baihetan Hydropower Station is involved, and the blasting vibration is monitored along either the vertical or the horizontal direction. The monitoring results of the distribution of blasting vibration on the high sidewall shows the vibration velocity at some positions far away from the detonation source is greater than that near the source. Such abnormal elevation amplification phenomenon is different from the distribution of blasting vibration on the slope of open-pit mine. To address this phenomenon, the dynamic finite element simulation is conducted. The comparison between the simulation results and monitoring data validates the proposed solution. Furthermore, the propagation law of blasting vibration velocity of high side wall is proposed, and the local elevation amplification effect of blasting vibration velocity is clarified. Finally, the modified Sadovskii formula is presented, and the reliability and accuracy of the modified formula for the vibration velocity of particles in the direction of elevation are verified and improved through data comparison.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Bulletin of Engineering Geology and the Environment
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.