Abstract

Put the first Phase Project of Qingdao Metro (line 3) civil 03 bid section TAI-YAN interval of blasting construction as the background In this paper,select the test section to blasting test,in groundposition on the ais of the tunnel workface arrange the measuring points and location of measuring points remain the same.Based on the measured data, studied on the law of blasting vibration of cutting parts of each of the driving cycle.The research result show that the cutting part of vibration velocity peak appeared in behind the tunnel woekface 1~3m;Rear vibration composite speed of the tunnel workface is speed of the tunnel workface is 1.0~1.4 times in front of the particle vibration composite speed;The main vibration frequency in front of tunnel workface and rear particles are above 15HZ.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.