Abstract
Finite element model analysis was performed with respect to patterns of load transfer relying on the action of aggregate interlocking and on the concurrent action of aggregate interlocking and dowel bars. The best timing for dowel bar retrofit was determined by way of increase in load transfer efficiency and maximum tensile stress borne at joints. The situation of dowel bar retrofit to restore load transfer efficiency was verified by way of onsite tests and economic analysis performed before we came to the conclusion that the way of dowel bar retrofit to restore load transfer efficiency is fairly cost effective. The construction technique of dowel bar retrofit to restore load transfer efficiency is finally summarized in light of engineering practice.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.