Abstract

This paper presents a disruption scheduling model for an environment of proportional two-machine no-wait flow shop. To achieve the objects of minimization of weighted sum of makespan and minimization of weighted sum of tardiness, we introduce a revised PSO algorithm which is designed with a neighborhood search structure. According to the experiment, the effectivity of the method proposed is proven.

Highlights

Read more

Summary

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call