Abstract

A severe Cr-contaminated site was left after the demolition of a Chemical plant. Based on the preliminary monitoring results and related literature data, this paper studied how to prevent and control the possible contamination from the site to Jialing River effectively, which is building an intercept contamination dam in the side of the contaminated site along Jialing River and constructing leachate collection system in the site. This is the antifouling effect: in the same stratum of the same elevation, the Cr6+content inside the intercept contamination dam (soil:144.8mg/kg∼827.4mg/kg, leaching solution: 7.3mg/L∼55.1mg/L) is higher than that of the outside (soil:10.4mg/kg∼64.9mg/kg, leaching solution: 0.27mg/L∼0.63mg/L); Water level of monitoring hole inside the dam is higher than that of the outside; the water level difference is 3.26m to 5.39m. The disaster controlling for the site provides security for the later contamination remediation and the river environment protection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.