Abstract

In terms of oil and natural gas pipe to be installed in working shaft, and in light of basic dimension of slurry shield machine and its supporting system, required parameters of working shaft, such as its diameter, lining structure, building envelope have been presented in this paper. Meanwhile, the thickness of building envelope and permanent concrete lining for working shaft is also proposed through the analysis of its elastic stability and anti-buoyancy under influence of earth and ground water pressure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.