Abstract

The New Tomei-Meishin expressway has a high-speed highway facility with six lanes (three lanes for each direction) throughout its total length of 502 km. The expressway is planned to form a new transportation backbone for Japan in the 21st century by connecting between Tokyo and Kobe. This expressway plays a supplemental expressway of the existing Tomei and Meishin expressways. The tunnels on the New Tomei-Meishin expressway have a very large, flattened cross-section of approximately 190 m2 excavation area, while the excavation width is approximately 18 m. There is no previous example of such a huge cross-section in the world. Thus, there are various problems regarding the technical configuration and the support structure in terms of construction such as how to excavate a large group of tunnels safely and efficiently. This paper describes the study and investigation related to design and construction method for large cross-section tunnels located in various ground conditions. (A)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.