Abstract

China has become the world's largest energy producer, so we must speed up the construction of a clean, low-carbon, safe and efficient energy system. The large-scale access of renewable energy has an impact on the safe and stable operation of power grid, which makes it unable to directly join the power market operation. The coordination control objects of virtual power plant (VPP) mainly include various DERs, energy storage system, controllable loads as well as electric vehicles. The coordination control methods are mainly divided into centralized control, centralized decentralized control and completely decentralized control. In China, the demonstration project of VPP operation has been carried out in State Grid Jibei and Shanghai Electric power company.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.