Abstract

After the Nujiang grid is divided, the overall grid structure is divided into two parts. That is, the power delivery channel and the distribution network load power supply channel. The basic grid of Nujiang has been fundamentally changed. The inherent difficulties in the operation of the Nujiang grid will remain and may lead to new problems. This paper systematically expounds the problems existing in the operation of power grids. For the new problems and some of the original problems, specific solutions are given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.