Abstract
This paper makes a study on the stress and deformation of complex steel structure in the process of hoisting and erection combining with an actual project, to determine the proper hosting and erection techniques in order to offer references and examples for other similar engineering construction. Tianjin Gallery is one of six projects of Tianjin Cultural Center. The steel structure project has an intense time limit, complex project requirements, heavy major diameter steel pipe columns, roof steel trusses in large quantity and huge work amount. In this study, we made a computational simulation and analysis to the work progress using ANSYS to find out the weak links and key control points of work progress in advance. Meanwhile, we monitored and controlled the whole process. The actual monitoring results tally with theoretical calculation data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.