Abstract

Construction quality is one of the main reasons which lead to the failure of cement deep mixing pile. In order to ensure the construction quality of cement deep mixing pile and control its construction process, the influence of four construction parameters such as slurry conveying capacity, drilling and hoisting speed, agitation shaft rotation speed and remixing times on pile quality are analyzed. At last key reasons to ensure the construction quality of cement deep mixing pile are pointed out. Pile quality and construction efficiency should be considered when construction parameters being optimized. The research results provide reference for construction of cement deep mixing piles in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.