Abstract

With characteristics of the long span and soft rock tunnel, this paper analyzes the main factors affecting tunnel stable on the basis of the way of tunnel excavation method. The large finite element program is used in research of a tunnel, with a numerical simulation of two different way, top heading and bench method and double side drift method. From the result of stress field and displacement field of the tunnel , some useful conclusion are obtained, that double side drift method is appropriate for this kind of soft rock tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.