Abstract

In order to comprehensively control the gas of 1151(3) fully mechanized caving face in Xieqiao coalmine scientificly and efficiently, combining the actual situation of the face, gas drainage technologies such as roof drilling, drilling along seam, gas drainage in upper corner, roof drainage roadway had been applied and a comprehensive gas control system was formed gradually. Gas problems of the face have been solved completely and safety and high efficiency of the workface has been ensured.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.