Abstract

Curve fitting method is one of the methods that predict and make analysis to the settlement and deformation of unballasted track tunnel project. Based on the measured date of the button of a certain unballasted track tunnels settlement, hyperbolic method and three-point method and Asaoka method were used to predict the settlement and deformation, according to the predicted result, we can get the best predicted method in this paper. The result shows that, on the premise of predictable, to a small accumulated settlement value and a small fluctuation state, the fitting result is close to each other with the prediction of three-point method and Asaoka method, while the result of hyperbolic method made it be the best choice here, as for the greater predicted post-construction settlement value and final settlement value, this method was regarded as a safe and reasonable method, which was regarded as the best one in the above three methods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.