Abstract

With the development of transportation construction and the acceleration of urbanization in China, the construction of urban highway tunnel engineering has also entered a new climax. In order to overcome obstacles in terrain and elevation such as railway construction, blasting technology for railway tunnel construction is widely used. However, due to the unhealthy and complex geological conditions of railway tunnels, and the unreasonable application of blasting technology, blasting safety accidents occur. Blasting technology in railway tunnel construction, but blasting construction is easily interfered by various external interference factors. In the tunnel face blasting construction under the condition of soil-rock crisscross composite stratum, not only the physical and mechanical properties of the lower surrounding rock should be considered, but also the engineering characteristics of the upper surrounding rock or surface rock mass have great influence on the construction blasting. Taking the actual project as an example, this paper expounds the tunnel engineering and geological conditions, and studies the blasting construction technology of the tunnel engineering in the soft and hard rock boundary soil-rock crisscross strata to ensure the safety of blasting construction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call