Abstract

Background and Objective:Prestressed high strength concrete pipe pile (PHC) shows brittle fracture when subjected to more than its own bearing capacity. Therefore, the non-prestressed steel bar is added to the PHC pipe pile, that is, the mixed reinforced pipe pile (PRC). The mechanical behavior of PRC group piles and PHC group piles under horizontal force is studied, and the bending moment diagram and displacement diagram of the pile body are compared so as to find the weak parts.Material and Method:In this paper, Φ600 pipe piles are chosen, and the PRC pipe piles are made of non prestressed steel bars of the same number as the prestressing steel bars, and the two steel bars are spaced apart. Referring to a specific project of Binhai New Area, the geological parameters are used, and the force analysis of group piles under horizontal force is carried out by using the ANSYS software.Results:ANSYS simulation results show that, under the horizontal loading, when the number of piles in group piles is different, the locations of maximum bending moments are different. Increasing the number of the PRC pipe pile with non prestressed reinforcement can effectively reduce the maximum bending moment of the pile body.Conclusion:Under horizontal load, with the increase of pile number and the pile cap aggrandizement, the position of maximum moment of pile body is shifted from 5-8 times diameter of pile to the top of pile. When the pile number reaches a certain amount, the maximum bending moment will appear at the joint between the pile cap and the pile body. At the same time, increasing the non prestressed steel bar does not influence the bending moment, and the reinforcement of the pile cap and the pile top should be strengthened.

Highlights

  • Because of its high bearing capacity, low cost, standardized production, convenient construction and easy to detection, the prestressed concrete pipe pile is widely used in high-rise building foundation, foundation pit retaining structure and retaining structure

  • Based on a specific project in Tianjin, this paper mainly studies the mechanical behavior of double piles, four piles and nine piles under horizontal force, and the improvement of mechanical performance of PRC pipe pile in place of PHC pipe pile

  • The maximum displacement of PRC pipe pile is lower by 9.2% than that of PHC pipe pile, and the maximum bending moment of pipe pile decreases by 2%

Read more

Summary

Results

ANSYS simulation results show that, under the horizontal loading, when the number of piles in group piles is different, the locations of maximum bending moments are different. Increasing the number of the PRC pipe pile with non prestressed reinforcement can effectively reduce the maximum bending moment of the pile body

Conclusion
INTRODUCTION
PROJECT OVERVIEW
MODEL ESTABLISHMENT
MODEL VALIDATION
Test Result
Internal Force Analysis of Nine Piles
CONCLUSION
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call