Abstract

KONIAMBO project affiliated to the OFFSHORE OIL ENGINEERING CO., LTD is the world's first smelting plant using large modular construction and integration, which is the first integrated, modular building project with many potential risks .In this paper, project risk management system, control method and requirements were built based on risk matrix assessment method, potential risks in each stage and aspect were evaluated, controlled and managed,then risk management guarantee is provided for KONIAMBO project implementation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call