Abstract

This paper presents a practical and effective novel approach to solve the coordination problem caused by the curve intersection of overcurrent relays in subtransmission systems. Based on the IEEE and IEC standard characteristic curve equations of digital overcurrent relays, as well as the simulation curve equation for electromagnetic overcurrent relays, lever setting adjustment equations for a selected point on the characteristic curve is derived. Then, centered on the derived equations, a dedicated software program is developed to compute the corresponding relay lever setting with different tap value in order that, passing through the selected point, another curve with the new lever setting is chosen. Finally, assisting with the graphical capability of the commercial ASPEN OneLiner, the proposed fixed-point coordination curve adjustment procedure can completely eliminate the coordination curve intersections. In addition, an actual case of a subtransmission network in Taiwan Power Company is simulated to validate the feasibility of the technique proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.