Abstract

Rapid growth in construction industry has increased the problems of construction waste around the world. In Malaysia, the construction industry plays a significant role both in the infrastructure development and economic sectors. The construction industry is been regarded as one of the major contributors of negative impact to the environment. To reduce these negative impacts, it needs a comprehensive understanding of the construction waste generation and management. Hence, the objective of this research are to identify the construction waste generation on site, to quantify the physical wastes that are generated at the construction site and to determine the construction waste management plan that have been applied in project. This research involves two ways of data collection which are by interviews and site observation. This study was conducted at three site's projects around Batu Pahat, Johor. The data collection were taken weekly in two month duration. The finding shows that, there were six types of waste produce on the three sites which are timber, metal, concrete, mortar, packaging waste and bricks. Throughout the quantifying data of the construction wastes, it shows that timber wastes were the largest contributor to the construction wastes which then followed by bricks, packaging waste and concrete. Study on construction Waste Management Plan (WMP) at sites had showed that, they were not fully applied of WMP. Hence, to minimize the waste, WMP should be fully applied on site. The finding will be an input to authorities in shaping better policy of construction waste management.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call