Abstract

For deep-sea diking engineering, the water is deep, wave is high and stream is torrential in the erection stage, so the construction difficulty is very high. In this paper, the authors prove the feasibility of realizing the deep-sea erection by the pioneering dike from aspects of structure of the pioneering dike, construction equipments and operation procedures, etc., utilizing features of the pioneering dike, such as small body, flexible and fast construction, and capacity to fully utilize the conditions of falling tide.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.