Abstract

In view of rapid water cut increasing and poor oil recovery with banded distribution with high permeability belt in sandstone reservoir of Huabei Oilfield,the electrical bridge technique for water shut-off is proposed. Based on years practice of vertical wells and similarity in Ohms and Darcys laws,the electrical model involved variable resistors series/parallel instead of reservoir distribution,the arm-bridge circuit combined with signal detection. Then response of the circuit by variable water shut-off could be simulated. The results indicated that,the driving pressure and seepage quantity at mid-low permeability channel could be greatly improved by the strong in-depth water-plugging at high permeability channel (L=20~40m),and the low permeability flowrate increased to a maximum of 55.3%. Then the gel dam in-depth fluid diversion technique was verified by water plugging and circuit simulation. The conclusions provided a valuable guidance for horizontal wells development enhanced.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.