Abstract
Continuous investigation and measurement of pore water pressure and arching depression play an important role in detecting the occurrence of hydraulic failure in earth dams. Increasing the pore water pressure during the initial impounding period reduces the effective stress and consequently decreases the shear strength of the earth dam core, which can overcome the water stress over the effective stress and consequently hydraulic failure. This research studies the hydraulic failure of Eyvashan earth dam under static loading conditions at the end of construction and the initial impounding period by Geostudio software with the Mohr-Coulomb behavioral model. The analysis shows that the values of the pore water pressure ratio (ru) and stress-strain values are acceptable and there is no stability problem for the dam. The highest percentage of arching (the lowest ratio of arching) is equal to 46%, at one-third of the lower height of the core. The critical arching ratio (maximum) is 0.44 and is in the normal range and hydraulic failure does not not occur despite the critical arching in the dam core.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.