Abstract

To study the characteristics of ground settlement of tunnel shield construction in loess area, considering the particularity of loess area, a 3D numerical simulation software named FLAC3D is used to calculate the ground settlement of tunnel shield construction. Distribution law of transversal and longitudinal settlement, deformation characteristics of subway structure and surrounding rocks in the condition of soaking and not soaking loess soil are studied in the paper. According to the numerical simulation results, general law of ground settlement in loess area can be summarized finally. The analysis results may have some guiding significance for the design and construction of metro tunnel in loess area.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.