Abstract

In order to slow down the serious NIMBY (Not In My Back Yard) syndrome on power grid project, maintain stable development of power grid and social harmony, this paper establishes a reasonable and scientific NIMBY risk comprehensive evaluation system of power grid project. Comprehensive NIMBY factors that affect power grid project is proposed. Making quantitative analysis to NIMBY syndrome on the basis of improved radar chart and improved AHP (Analytic Hierarchy Process). The improved radar chart supplies the gap that traditional radar chart evaluation result is not unique, the improved AHP does not need consistency check and it can reduce calculation amount apparently and simplicity. Finally, example analysis of different substations verifies the rationality and feasibility of the proposed evaluation system, it shows that this system can provide scientific basis for the facility siting and governance of risk in power grid project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call