Abstract

Some hydraulic studies to find an adequate solution for a discharge chute canal are presented in this paper. Tha chute canal is appropriate work of the Lechugal 2 earth dam (H=20 m), which is part of a large irrigation system from Ecuador, presently under construction.Studies have consisted in experiments on hydraulic model of the chute canal built at geometrical scale 1:35 and by numerical simulations in one-dimensional steady flow running HecRas software. In first stage numerical model was calibrated based on experiment results and in second stage other three constructive variants of the chute canal were analysed numerically in order to improve the solution settled by hydraulic model.The technical performances of each variant settled by these experimental and numerical studies follow to be completed with economical analyses which will allow designer to choose the best solution for discharge chute canal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call