Abstract
Examination of the early hydration of a production Class G oilwell cement by conduction calorimetry under temperature simulated API Schedule 5 and Schedule 8 conditions, using calcium ligno-sulphonate retarder and ‘doped’ additions of pure tricalcium silicate and tricalcium aluminate, has demonstrated significant changes in the precise course of hydration if one or more of these additions be present. Reasons for such changes are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.