Abstract

This packaging system transports current generation, light water reactor (LWR) nuclear fuel assemblies via railroad shipment. The study basis was prior full-scale tests with the IF-300 system and simulations of fuel unloading operations at the BNFP. Specific tasks and areas of study included: (1) sequential dry-run handling operations under simulated unloading conditions, (2) detailed time and manpower studies, (3) estimates of operator radiation exposure, and (4) a general evaluation of the cask system capabilities as they relate to unloading facility operations. The latter includes suggestions for improvements to equipment, facilities, and procedures. Additionally, general information on the design of the cask and auxiliary equipment, the Certificate-of-Compliance (COC), and a fuel compatibility matrix are included.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.