Abstract

PT. PAMA is a company engaged in mining and is a contractor of PT. Indominco Mandiri which has been running since 1996. The work contract given is blasting, from blasting activities many impacts arise, one of which is ground vibration, therefore it is necessary to measure the level of ground vibration in the west block area where there are several critical areas in the form of buildings such as offices , solar (fuel oil) storage, and PT. Indominco Mandiri, where there have been complaints regarding large vibrations and the potential for diesel spills from fuel oil. In the study the peak vector sum (pvs) value produced in December 2022 was 1.57 mm/s with the closest distance of 785 meters and in January 2023 4.21 mm/s with a distance of 500 meters. The maximum use of explosives item for explosive holes in December 2022 and January 2023 is 2,513 kg. This pvs value is still safe, because it is still below 5.0 mm/s and according to SNI 7572: 2010.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.