Abstract

Caramele river as upper of karajae river in the parepare city potencial development running water fish pond culture and integrated of tourism and environment sustainability resource. This aimed study to evaluated technical and non technical feasibility aspect arounded karajae river for running water fish pond system. The study used purpose sampling method and variable investigated include; (1) water quality (temperature, velocity, vegetation, soil texture, bentic organism, oxygen,pH,accesability, etc.), (2) environment and social economic impact for native people in the around area. Investigation area fixed three station. The result of the study revealed that feasibility each stations appromixately are Station I (71,3%), Station II (71,3%) and Station III (71,0%). The stations feasibility for development of running water fish pond system are Station I and II.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.