Abstract

Transportation is one type of movement that occurs in life in carrying out every activity; however, in large cities, transportation problems such as traffic jams frequently occur. One among them is Bekasi City, where one of the crossroads in the CBT area of Bekasi City, particularly the signalized intersection of Jalan Raya Pekayon, Bekasi City, is facing extreme traffic. During peak hours, the volume of traffic flow causes a backlog of vehicles on the road at each leg of the crossroads. Based on the problem description, this study will look into the management and engineering of signalized intersection traffic on Jalan Raya Pekayon. This study uses a quantitative method with analysis based on the 2014 Indonesian Road Capacity Guidelines. The results show that the number of cycle times and the condition of the current phase at the intersection are still less effective, owing to the intersection's performance assessment, especially the degree of saturation, delays, and queues, which are still very high. However, after analyzing the proposed problem-solving scenario in Scenario 2, there is an increase in intersection performance with a decrease in delays of 89.80% (weekdays), 75.31% (weekends), queues of 87.21% (weekdays), and 68.78% (weekends).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.