Abstract

One of the primary objectives for Space Shuttle mission STS-49 is to perform three EVAs on consecutive days in a manner similar to those planned for Space Station Freedom (SSF) assembly missions. The preparation and completion of this mission will serve as a pathfinder for future EVA intensive SSF assembly flights. Several operational issues pertaining to the EMU have been addressed in preparation for this mission. Provisioning and orbiter stowage of the EMU and associated hardware have been optimized for four EVA crewmembers. EMU preparatory and maintenance activities have been streamlined to help minimize crew overhead and have been carefully integrated into a very demanding mission timeline. The constraints and limitations have been assessed in providing a backup EMU capability for each EVA crewmember. Several EMU concerns have also been addressed in supporting new EVA task requirements, such as large mass handling and performing SSF assembly operations over the crew cabin and nose of the Shuttle orbiter.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.